THINGS THAT HAPPENED OR HAPPENING AT THE TRACK


 

 

THINGS THAT ARE HAPPENING AT THE TRACK 2012

 

JULY 2012

REMOVE GUARD RAILS AT PIT ENTRANCE

RE-DO DRAINAGE AT PIT ENTRANCE

ADD VICTORY LANE SIGN IN PITS FOR PHOTOS

CLEAN UP POLES IN LOWER PITS

RECEIVE 4 LOAD OF ROAD MILLINGS FROM D&H EXCAVATING

BEER LICENSE BY D&F ENTERPRISES

REMOVE BIG ROAD SIGN AT PIT ENTRANCE

4 NEW GUY WIRES ON SAS ROAD SIGN

MORE SIGNS ADDED TO THE BACK OF THE GRANDSTANDS

RE DO ALL THE FRONT STRAIGHTAWAY LIGHTS

 NEW MOTORCYCLE / ATV TT TRACK THRU THE INFIELD

NEW SOFFITS ON THE CONCESSION STAND

3 NEW FENCE FLAGS

SUE S. PAINTING A FEW BUILDINGS

SUE S. MOWING AND TRIMMING

PAINT FLAG POLE

NEW FLASHING LIGHT AT PIT ENTRANCE

NEW LINE UP AREA FOR MOTORCYCLES

 

 

MAY JUNE 2012

LOAN NEW ZERO TURN MOWER FROM AL'S MAINTENANCE

NO STANDING POSTS AND ROPE IN PITS

4 NEW 70 VOLT SPEAKERS IN PITS

PIT BLEACHERS MOVED AND RE-LEVELED

REPLACED 50 BLEACHER BOARDS

PIT FENCE REPAIRS

WATER SYSTEM BACK ON AND TESTED

MOTOR WORK ON AMBULANCE...BACK AT TRACK

PICK UP USED MF1100 TRACTOR FOR TRACK WORK

 

April 2012

NEW TICKET BOOTH AT NORTH ENTRANCE

REMOVE FENCE BETWEEN PIT AND GRANDSTANDS.

HOOK UP METERED ELECTRIC FOR THE MOTOCROSS AREA.

NEW MAIL BOX AND POST

NEW SAS BANNER INSTALLED AT ARCADE TRACTOR SUPPLY

STARTED BUILDING NEW MOTORCYCLE / ATV TT TRACK THRU THE INFIELD

NEW FASCIA BOARDS (80 FT) ON SHOP.

OVAL TRACK PREP.

FENCE REPAIRS

PLAQUES AND TROPHIES MADE FOR 2012

NEW WIRELESS PA SYSTEM FOR TOWER

ROGER WHITMAN...PAINTING OF SOME BUILDINGS.

FRANK....WORKING ON A BEER LICENSE

SUE SOLARI STARTED LAWN MOWING

NEW INDICATOR LIGHTS ON WELL AND SEPTIC SYSTEMS

NEW ALUM CEILING AND ELECTRIC IN RESTAURANT

NEW CUTTING BLADE ON LAND LEVELER

BOUGHT ANOTHER TRACTOR FOR TRACK PREP....NEEDS MOTOR WORK

 

Jan - March 2012

ADDED AHRMA VINTAGE RACE TO SCHEDULE...SUNDAY AUG 5 2012

REPAIRS TO RED TOW TRUCK

NEW PLUMBING IN MEN'S ROOM

HAD A SAS BOOTH AT 3 BANQUETS AND 1 CAR SHOW IN HAMBURG NY

WORKING ON THE 2012 MOTORCYCLE FLAT TRACK SCHEDULE WITH OTHER TRACKS

 


 

THINGS THAT HAPPENED AT THE TRACK 2011

 

JUNE-DEC 2011

SUE S. PAINTED WATER TANK ON RED WATER TRUCK

NEW SOFFIT ON WATER/ELEC BUILDING

NEW OIL FURNACE IN MAIN OFFICE

WINTERIZING TRUCKS, WATER SYSTEMS

1st EVER MOTORCYCLE FLAT TRACK RACE ON OCT 9th

NEW POSTS AND GATE FOR ENTRANCE ROAD

NEW STEP FOR GRANDSTANDS

NEW SIGNS AND BANNERS

NEW VICTORY LANE SIGNS

NEW RED TOW TRUCK

NEW EXHAUST SYSTEM ON THE DUMP TRUCK

DON, SUE, TRACY......MOWING AND TRIMMING

CLEAN UP SEPTIC TANK AREA

MOVE FENCING OFF CONCRETE PADS

SCHWAB AGGREGATES ...10 LOADS OF GRAVEL

NEW SIDEWALK FROM RESTROOMS TO GRANDSTANDS

NEW 4" POND WATER PUMP FROM AL'S MAINTENANCE IN ROCHESTER

BUILT A NEW FIRE TRUCK

ATTEMPTING TO GET THE LAP COUNTER WORKING

REDID FRONT STRAIGHTAWAY INSIDE WALL

REDOING FRONT STRAIGHTAWAY DRAINAGE

 

JAN-MAY 2011

NEW SIDEWALK FROM PARKING LOT TO GRANDSTANDS

50/50 ROGER PAINTED YELLOW GRANDSTAND WALKWAYS

NEW STONE RAMPS TO RESTROOMS FOR OUR WHEEL CHAIRED FANS

NEW FAUCETS IN THE PIT RESTAURANT

BOUGHT A GRADER....(NEEDS SOME WORK)

NEW CULVERT AND STONE IN PIT ENTRANCE

NEW METAL ROOF ON TICKET BOOTH

INSTALLED A NEW CAUTION LIGHT IN TURN 3/4

NEW LIGHTED EVENT SIGN

INSTALLED NEW ELECTRIC LINE TO MAIN SIGN

NEW HITCH STABILIZERS ON 8N

NEW SIDEWALKS AND DRAINAGE AROUND MAIN CONCESSION BUILDING

NEW GATE FOR UPPER PIT EXIT

REDOING FRONT STRAIGHTAWAY INSIDE WALL

REDOING FRONT STRAIGHTAWAY DRAINAGE

RE-LETTERING SIGNAGE

INTERVIEWING MAY NEW EMPLOYEES

2011 RACE SCHEDULE

RED WATER TRUCK HAS RECEIVED A REHAB OVER THE WINTER

NEW BEARINGS/WHEELS ON FINISH MOWER

 


 

THINGS THAT HAPPENED AT THE TRACK 2010

 

OCT-DEC

ALL ELECTRONIC PARTS REPAIRED FOR LAP COUNTER

2 NEW SETS OF SCALES BOUGHT

RE-LETTERING SIGNAGE

NEW LIGHTED ROAD SIGN (WITH FLASHING ARROW) BOUGHT

REDOING FRONT STRAIGHTAWAY INSIDE WALL

REDOING FRONT STRAIGHTAWAY DRAINAGE

INTERVIEWING NEW EMPLOYEES

NEW DRIVEWAY STONE...NORTH ENTRANCE

ADDING MANY LOADS OF CLAY TO TRACK

PAINT TANK ON BLUE WATER TRUCK...SUE & DON

200FT NEW FENCING AND POSTS PIT EXIT, BY MAIN OFFICE

 

AUG-SEPT

PUMP SEPTIC TANK

NEW METAL ROOF & SIDING ON THE REAR OF THE MAIN OFFICE

WINTERIZING WATER SYSTEM FOR THE WINTER

WINTERIZING AND REPAIRING EQUIPMENT

TRACK DRAINAGE REPAIR

SCREENING CLAY

A 2ND TIRE DRAG HAS BEEN BUILT

 

JUNE-JULY

NEW CAMPFIRE RING ADDED IN THE PITS

NEW METAL ROOF ON THE PHOTO BUILDING IS NOW COMPLETE.

WE ARE STARTING TO APPLY WEED KILLER UNDER THE GRANDSTANDS.

ADDED A SHOWER STALL IN THE RESTROOM....FOR THE OVERNIGHT CAMPERS

ADDED A BURM AROUND THE SEPTIC SYSTEM

A NEW 3 TIRE DRAG HAS BEEN BUILT....WORKS GOOD.

NEW CATCH BASIN AND 8" DRAIN LINE IN PARKING LOT COMPLETE

NEW DRAINAGE TRACK FRONT STRETCH

NEW WATER PUMP FOR RACE CAR COOLING AT LINE UP SHOOT

NEW SCREENING AND PAINTING AT FLAG STAND

NEW PA FOR 1 WAY RADIO'S NEAR PIT GRANDSTANDS

REPAIR MORE GRANDSTAND BOARDS

NEW TIRES AROUND TRACK WALLS AND LIGHT POLES

 

MAY 29-JUNE 4

NEW FLOOD LIGHT FOR THE LOWER PITS

REPAIR & RE-AIM A FEW TRACK LITES

ROUND 4 OF DE-ROCKING THE TRACK.

REMOVE A FEW MORE HUMPS ON THE TRACK.

WE NEED ANOTHER SMALL TRUCK TO PULL THE OTHER PACKER DOLLY.

 

MAY 21-28

NEW BACKSTRETCH FLAGGER STAND IN PLACE.

ROUND 3 OF DE-ROCKING THE TRACK.

REMOVE A FEW HUMPS ON THE TRACK.

THE TRACK OFFICE MOVED TO THE TOWER 1ST FLOOR.

REPAIRING BROKEN SEPTIC PUMP LINES.

WATER TRUCK REPAIRS

 

MAY 15-16

RESHAPE TURN 1 & 4

ROUND 2 OF DE-ROCKING THE TRACK.....8 DUMP TRUCK LOADS.

50/50 ROGER W....FINISHED PAINTING STAIR ISLES.

THE SHEEP-FOOT PACKER SHOULD SHOW UP THIS WEEK.

WE WILL FIX THE LITES THAT WERE NOT WORKING PROPERLY.

THE 3RD TURN CAUTION LITE WILL BE FIXED...BROKEN UG WIRE.

THE LOWER PIT ROAD WAS UNDER WATER FRIDAY NIGHT...WE COULD NOT GET TO THE POND.

 

MAY 7-14

WE HAVE A BASIC SOUND SYSTEM SET UP FOR FRIDAY NIGHT

TIM, DON K, DON Y, BILL HAVE DON A GREAT JOB ON THE BLEACHER BOARDS.....ONLY A FEW MORE TO DO.

THANKS TO SUE, DIANE, TRACY FOR ALL THE PAINTING, GRASS MOWING AND CLEAN UP.

ROGER W. OUR 50/50 GUY HAS BEEN PAINTING THE BLEACHER ISLE WAYS.

WE RECEIVED HEALTH BOARD INSPECTION APPROVAL ON TUESDAY.

BOTH CONCESSION STANDS WILL BE OPEN ON FRIDAY.

JOHN K HAS BEEN DOING A TON OF ODD JOBS...THANKS.

ALL THIS BAD WEATHER IS SLOWING US DOWN.

THERE WILL BE A LOT OF THINGS NOT COMPLETED BY THE OPENER.

 

TIM, DON K, DON Y, BILL HAVE DON A GREAT JOB ON THE BLEACHER BOARDS.....ONLY A FEW MORE TO DO.

WE RECEIVED HEALTH BOARD INSPECTION APPROVAL ON TUESDAY.

ALL THIS BAD WEATHER IS SLOWING US DOWN.

THERE WILL BE A LOT OF THINGS NOT COMPLETED BY THE OPENER.

 

ONLY 1 ROOF BLEW OFF FROM SATURDAY'S STORM.

A BETTER SOUND SYSTEM IN THE PITS AND GRANDSTANDS WILL BE IN PLACE BY THE MAY 14TH OPENER.

2 GRANDSTANDS HAVE BEEN ADDED IN TURN 1. RAILING WILL BE ADDED SOMETIME SOON.

ALMOST EVERYTHING IS READY TO GO.

ALL NEW PLUMBING TO ALL BUILDINGS IS COMPLETE.

 

NEW PIT GATES HAVE BEEN INSTALLED.

2 NEW PIT ENTRY/EXIT FLOOD POLE LIGHTS ARE NOW INSTALLED.

WE ARE IN THE PROCESS OF BUILDING A WATER TRUCK LOOP ROAD BY THE LOWER POND.

2 WOOD POLES ARE IN PLACE TO BUILD A WATER TRUCK LOADING SYSTEM.

A BACK UP WATER TRUCK HAS BEEN BOUGHT.

A SMALL 12' DISK HAS BEEN BOUGHT.

ALL NEW WATER & DRAIN LINES TO ALL BUILDINGS ARE DONE.

WIRING THE NEW WATER PUMP & CHLORINATING SYSTEM WILL BE DONE THIS WEEK.

TIM H. WILL FINISH THE SIDING ON THE WATER BUILDING BY THURSDAY.

ALL WATER HOOK-UP WILL BE COMPLETED THIS WEEK.

RE WIRING ALL THE TRACK CAUTION LITE SYSTEM HAS STARTED.

REWIRING THE SOUND SYSTEM STARTS THIS WEEK

3 NEW WATER HEATERS HAVE BEEN PLACED.

TESTING AND ADJUSTING THE TRACK LITES TO BE DONE SOON.

 

NEW TRACK OFFICE NOW UNDER THE TOWER WITH NEW DRIVER PAYOUT WINDOWS & SIDING.

CARPENTER/HANDYMAN TIM H. IS DOING A GREAT JOB.

 

NEW PIT OFFICE IS IN PLACE AND PAINTED.

NEW METAL ROOFS ARE DONE ON THE MAIN TOWER AND PIT SHACK.

A NEW CATCH BASIN HAS BEEN INSTALLED FOR THE INFIELD WATER.

NEW GATE POSTS HAVE BEEN SET AT ALL ROADWAY ENTRANCES.

PAINTING IS COMING ALONG ON THE BUILDINGS.

1st ROUND OF GRASS MOWING HAS BEEN STARTED.

A NEW LAYOUT FOR THE MOTOCROSS TRACK IS ALMOST COMPLETE.

FRANK HAS BEEN REDOING THE OLD PIT CONCESSION STAND.

NEW LIGHTING IN THE PITS AND GRANDSTAND PARKING HAS STARTED.

THE SOUVENIR STAND IS GETTING A MAKEOVER FROM KEN.

 

THANKS TO ALL THE GANG THAT IS HELPING OUT.

 

 

 

TO DO

TRADES WELCOME

INSIDE THE MAIN TECH BUILDING COULD USE A METAL OR DRYWALL CEILING 30' X 40'.

FENCING REBUILD AND REPAIR.

PA SYSTEM.

RAILINGS FOR SOME BLEACHERS.

TRACK & ROADWAY DRAINAGE.

CONCRETE WALL PAINTING.

TELEPHONE UG WIRING TO GRANDSTAND OFFICE.

SCOREBOARD REPAIR, NEW UNDERGROUND WIRING (750ft)

 VIP TOWERS BEHIND THE MAIN GRANDSTANDS

VIDEO TOWER

NEW ROOFS NEEDED ON TICKET BOOTHS

MAIN BUILDING

PIT CONCESSION